Milwaukee 833 E Michigan St, Suite 1000 Milwaukee, Wisconsin 53202 

Appleton 4351 W College Ave, Suite 420 Appleton, Wisconsin 54914

Catalyst Construction

  • Facebook Social Icon

ST. PAUL'S LUTHERAN CHURCH

 

Project Name: St. Paul's Lutheran Church


Address: Muskego, WI

 

Architect: Groth Design Group

 

Completion Date: October 2010

 

Project Description: Catalyst Construction was selected as the Construction Manager to build a new 20,000 square foot classroom and gym expansion for St. Paul’s Lutheran in Muskego. As part of the team, Catalyst helped the owner receive grants through Focus On Energy (FOE) for solar panels and many upgrades to the HVAC system. These energy upgrades, at no additional cost, allowed the owner to include a system that provided a lower operating cost through the life of the building.

EDUCATION